{"id":4644,"date":"2026-10-06T06:00:52","date_gmt":"2026-10-06T04:00:52","guid":{"rendered":"https:\/\/www.lenam.cz\/?p=4644"},"modified":"2026-11-18T12:01:42","modified_gmt":"2026-11-18T11:01:42","slug":"the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation","status":"publish","type":"post","link":"https:\/\/www.lenam.cz\/en\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\/","title":{"rendered":"The Cost of Finding an Error Too Late: The Economics of Engineering Simulation"},"content":{"rendered":"<p><strong>How much can an error cost when today it appears to be nothing more than a minor uncertainty in a 3D model? If a design engineer identifies it on screen, it usually takes little more than adjusting the geometry and updating the drawing. If the same issue only emerges during physical testing, type approval or series production, the costs rise sharply. Scrapped material, tooling modifications, repeated testing and the risk of penalties for a delayed production launch all add to the bill.<\/strong><\/p>\n<p><span style=\"font-weight: 400\">According to Eurostat data, average hourly labour costs in the EU are close to \u20ac35. Every unnecessary round of drawing revisions, development dead end or unplanned test facility downtime therefore <\/span><b>has an immediate and measurable impact on the budget<\/b><span style=\"font-weight: 400\">. The purpose of simulation is not to produce attractive colour plots, but to provide management with <\/span><b>a reliable basis for decision-making<\/b><span style=\"font-weight: 400\"> \u2013 at a stage when making changes on screen takes minutes rather than risking hundreds of thousands in losses on failed prototypes.<\/span><\/p>\n<h2><b>Why Errors Become Significantly More Expensive the Later They Are Discovered<\/b><\/h2>\n<p><span style=\"font-weight: 400\">In engineering development, there is a simple relationship: the later a design flaw is discovered, the more subsequent steps, tooling and investments have to be revisited and reworked.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>During the design phase:<\/b><span style=\"font-weight: 400\"> The only costs are engineering time and modifications to the CAD model.<\/span><\/li>\n<li style=\"font-weight: 400\"><b>During prototype manufacture:<\/b><span style=\"font-weight: 400\"> Costs include new material, revisions to CNC programs, manufacture of a new component and additional testing time.<\/span><\/li>\n<li style=\"font-weight: 400\"><b>During type approval and certification:<\/b><span style=\"font-weight: 400\"> A failed test means repeating the entire approval process and puts the start of series production at risk.<\/span><\/li>\n<li style=\"font-weight: 400\"><b>During series production:<\/b><span style=\"font-weight: 400\"> The consequences include production line downtime, costly modifications to stamping dies or injection moulds, sorting of affected parts, warranty claims and the risk of reputational damage.<\/span><\/li>\n<\/ul>\n<p><b>Engineering simulation serves as a technical risk management tool.<\/b><span style=\"font-weight: 400\"> The cost of virtual prevention is known in advance and can be planned. The costs of dealing with a real-world failure, by contrast, invariably arise at the worst possible time and under intense time pressure.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-4656 size-large\" src=\"https:\/\/www.lenam.cz\/wp-content\/uploads\/2026\/09\/20260130-104145-1024x577.jpg\" alt=\"\" width=\"1024\" height=\"577\" srcset=\"https:\/\/www.lenam.cz\/wp-content\/uploads\/2026\/09\/20260130-104145-1024x577.jpg 1024w, https:\/\/www.lenam.cz\/wp-content\/uploads\/2026\/09\/20260130-104145-300x169.jpg 300w\" sizes=\"auto, (max-width:767px) 767px, (max-width:1024px) 100vw, 1024px\" \/><\/p>\n<h2><b>When Does Simulation Pay Off? The Simple Mathematics of Risk<\/b><\/h2>\n<p><span style=\"font-weight: 400\">The basic economic calculation is straightforward:<\/span><\/p>\n<p><span style=\"font-weight: 400\">loss = Probability of failure \u00d7 Financial impact of the failure<\/span><\/p>\n<p><span style=\"font-weight: 400\">The financial impact includes not only the defective component itself, but also the cost of a new prototype, repeated testing, tooling modifications or penalties for a delayed production launch. If this amount exceeds the cost of <\/span><b>structural analysis (Finite Element Method \u2013 FEM) or flow and thermal analysis (CFD)<\/b><span style=\"font-weight: 400\">, virtual validation clearly makes economic sense.<\/span><\/p>\n<p><span style=\"font-weight: 400\">CAE simulations deliver the fastest return on investment for:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>safety-critical and highly loaded components<\/b><span style=\"font-weight: 400\"> subject to stringent service-life requirements,<\/span><\/li>\n<li style=\"font-weight: 400\"><b>components requiring expensive tooling<\/b><span style=\"font-weight: 400\"> (injection moulds, casting tooling), where each modification can cost hundreds of thousands of Czech crowns,<\/span><\/li>\n<li style=\"font-weight: 400\"><b>complex systems<\/b><span style=\"font-weight: 400\">, where sensitivity analysis can quickly reveal the effects of thickness, material or temperature.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400\">Even a targeted simulation costing tens of thousands of Czech crowns is a negligible investment if it prevents a failed prototype or avoids disruption to a production launch.<\/span><\/p>\n<h2><b>Comparison of Development Approaches<\/b><\/h2>\n<p><span style=\"font-weight: 400\">Simulation does not replace physical testing across the board. It does, however, eliminate development dead ends where an expensive prototype is manufactured only to reveal something that could have been identified in advance through virtual testing.<\/span><\/p>\n<div class=\"lenam-table-scroll\" role=\"region\" aria-label=\"Table\" tabindex=\"0\"><table>\n<tbody>\n<tr>\n<td><b>Development approach<\/b><\/td>\n<td><b>Initial cost<\/b><\/td>\n<td><b>Decision speed<\/b><\/td>\n<td><b>Number of physical prototypes<\/b><\/td>\n<td><b>Technical risk<\/b><\/td>\n<td><b>Suitable applications<\/b><\/td>\n<\/tr>\n<tr>\n<td><b>Without analysis<\/b><\/td>\n<td><span style=\"font-weight: 400\">Low initially<\/span><\/td>\n<td><span style=\"font-weight: 400\">Slow (waiting for a prototype)<\/span><\/td>\n<td><span style=\"font-weight: 400\">High<\/span><\/td>\n<td><span style=\"font-weight: 400\">High<\/span><\/td>\n<td><span style=\"font-weight: 400\">Simple components with well-established geometry<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>FEM analysis<\/b><\/td>\n<td><span style=\"font-weight: 400\">Depends on model complexity<\/span><\/td>\n<td><span style=\"font-weight: 400\">Fast to moderate<\/span><\/td>\n<td><span style=\"font-weight: 400\">Limited (1\u20132 iterations)<\/span><\/td>\n<td><span style=\"font-weight: 400\">Low<\/span><\/td>\n<td><span style=\"font-weight: 400\">Sizing, weight reduction, stress analysis<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>CFD or thermal analysis<\/b><\/td>\n<td><span style=\"font-weight: 400\">Depends on the complexity of the physics involved<\/span><\/td>\n<td><span style=\"font-weight: 400\">Moderate<\/span><\/td>\n<td><span style=\"font-weight: 400\">Limited<\/span><\/td>\n<td><span style=\"font-weight: 400\">Limited<\/span><\/td>\n<td><span style=\"font-weight: 400\">Cooling, aerodynamics, heat exchangers<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Physical prototype<\/b><\/td>\n<td><span style=\"font-weight: 400\">Manufacturing and testing costs<\/span><\/td>\n<td><span style=\"font-weight: 400\">Slow<\/span><\/td>\n<td><span style=\"font-weight: 400\">At least one complete cycle<\/span><\/td>\n<td><span style=\"font-weight: 400\">Moderate<\/span><\/td>\n<td><span style=\"font-weight: 400\">Final verification of overall functionality<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Combined approach<\/b><\/td>\n<td><span style=\"font-weight: 400\">Higher upfront investment<\/span><\/td>\n<td><span style=\"font-weight: 400\">Controlled through milestones<\/span><\/td>\n<td><span style=\"font-weight: 400\">Targeted (optimised)<\/span><\/td>\n<td><span style=\"font-weight: 400\">Lowest<\/span><\/td>\n<td><span style=\"font-weight: 400\">Regulated and safety-critical products<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<p>&nbsp;<\/p>\n<h2><b>When Is Simulation Sufficient and When Is Physical Testing Necessary?<\/b><\/h2>\n<p><span style=\"font-weight: 400\">As we explained in detail in our article on <\/span><strong><a href=\"https:\/\/www.lenam.cz\/en\/product-development-cannot-function-without-experimental-testing\/\" target=\"_blank\" rel=\"noopener\">why product development cannot do without experimental testing<\/a><\/strong><span style=\"font-weight: 400\">, the two disciplines do not compete with each other but complement one another. Engineering simulations (FEM for structural analysis, CFD for fluid flow or MBS for multibody dynamics) make it possible to quickly compare dozens of design variants, identify critical stress concentrations and optimise geometry before manufacturing begins.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Physical laboratory testing, on the other hand, captures the effects of the actual manufacturing process, such as component tolerances, weld quality or assembly inaccuracies. It is essential wherever a final test report is required by applicable standards or certification specifications (for example, EASA CS-25 certification specifications or ECSS standards for space projects), or where reliable material data is unavailable.<\/span><\/p>\n<p><span style=\"font-weight: 400\">A simulation can only be as accurate as its input data. That is why at <strong>LENAM<\/strong> we combine computational engineering with our own <\/span><strong><a href=\"https:\/\/www.lenam.cz\/en\/experimental-laboratory\/\" target=\"_blank\" rel=\"noopener\">experimental laboratory<\/a><\/strong><span style=\"font-weight: 400\"> \u2013 measured material data provide a reliable basis for our numerical models.<\/span><\/p>\n<h2><b>How to Prepare a Brief That Saves Time and Money<\/b><\/h2>\n<p><span style=\"font-weight: 400\">The cost and lead time of an analysis depend on the quality and completeness of the input data. To obtain a quotation quickly and start work efficiently, it is usually sufficient to provide:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>CAD geometry of the component<\/b><span style=\"font-weight: 400\"> in a neutral file format (STEP, Parasolid),<\/span><\/li>\n<li style=\"font-weight: 400\"><b>operating conditions<\/b><span style=\"font-weight: 400\">, including the magnitudes and directions of forces, pressures, operating temperatures and boundary conditions,<\/span><\/li>\n<li style=\"font-weight: 400\"><b>material specification<\/b><span style=\"font-weight: 400\">, including whether standard tabulated values are sufficient or an accurate material card based on laboratory measurements is available,<\/span><\/li>\n<li style=\"font-weight: 400\"><b>objective of the analysis and the decision it is intended to support<\/b><span style=\"font-weight: 400\">, such as identifying the cause of failure, reducing weight or assessing fatigue life.<\/span><\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-4659 size-large\" src=\"https:\/\/www.lenam.cz\/wp-content\/uploads\/2026\/09\/20260130-084145-1024x577.jpg\" alt=\"\" width=\"1024\" height=\"577\" srcset=\"https:\/\/www.lenam.cz\/wp-content\/uploads\/2026\/09\/20260130-084145-1024x577.jpg 1024w, https:\/\/www.lenam.cz\/wp-content\/uploads\/2026\/09\/20260130-084145-300x169.jpg 300w\" sizes=\"auto, (max-width:767px) 767px, (max-width:1024px) 100vw, 1024px\" \/><\/p>\n<h2><b>Managing Development Risk in Practice<\/b><\/h2>\n<p><span style=\"font-weight: 400\">The value of engineering simulation does not lie in colourful visualisations of analysis results. It lies in <\/span><b>eliminating costly errors<\/b><span style=\"font-weight: 400\">, reducing time to market and increasing confidence that the final product will <\/span><b>pass certification testing first time.<\/b><\/p>\n<p><span style=\"font-weight: 400\">At <strong>LENAM<\/strong>, we combine more than thirty years of experience in numerical simulation with our own testing facilities. We help design structures and components to operate safely under real-world conditions \u2013 from automotive components to rocket propulsion systems.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Are you making a design decision for a new component? <\/span><strong><a href=\"https:\/\/www.lenam.cz\/en\/contact\/\" target=\"_blank\" rel=\"noopener\">Contact our technical team<\/a><\/strong><span style=\"font-weight: 400\"> for a no-obligation assessment of your requirements.<\/span><\/p>\n<h3><b>Frequently Asked Questions About the Economics of Engineering Simulation (FAQ)<\/b><\/h3>\n<p><b>How much does an engineering simulation of a specific component cost?<\/b><\/p>\n<p><span style=\"font-weight: 400\">The cost depends on the geometry, type of analysis (e.g. linear static analysis vs non-linear dynamics) and the quality of the input data. It can range from tens of thousands of Czech crowns for individual assessments to comprehensive analysis packages for complex subassemblies. We provide an exact quotation based on the supplied 3D model and boundary conditions.<\/span><\/p>\n<p><b>How quickly does an investment in simulation pay off?<\/b><\/p>\n<p><span style=\"font-weight: 400\">The return on investment can be immediate \u2013 typically when a virtual model identifies a design flaw that would otherwise result in damage to expensive prototype tooling or lead to a failed certification test.<\/span><\/p>\n<p><b>Can FEM analysis completely replace physical prototypes?<\/b><\/p>\n<p><span style=\"font-weight: 400\">Not for safety-critical and regulated products, where type approval requires physical test results. Simulation can, however, significantly reduce the number of physical iterations required and increase confidence that the final test will be successful.<\/span><\/p>\n<p><b>What is the most common source of errors in simulations?<\/b><\/p>\n<p><span style=\"font-weight: 400\">Inaccurate input data \u2013 particularly generic tabulated values that do not reflect the specific batch of plastic or composite material being used, as well as oversimplified boundary conditions such as constraints and contacts. This is why we base our simulations on data from our own testing facilities and the expertise of our specialists.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>How much can an error cost when today it appears to be nothing more than a minor uncertainty in a 3D model? If a design engineer identifies it on screen, it usually takes little more than adjusting the geometry and updating the drawing. If the same issue only emerges during physical testing, type approval or series production, the costs rise sharply. Scrapped material, tooling modifications, repeated testing and the risk<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":13,"featured_media":4653,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[21],"tags":[],"class_list":["post-4644","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The Cost of Finding an Error Too Late: The Economics of Engineering Simulation | LENAM<\/title>\n<meta name=\"description\" content=\"How much can an error cost when today it appears to be nothing more than a minor uncertainty in a 3D model? If a design engineer identifies it on screen,\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.lenam.cz\/en\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Cost of Finding an Error Too Late: The Economics of Engineering Simulation | LENAM\" \/>\n<meta property=\"og:description\" content=\"How much can an error cost when today it appears to be nothing more than a minor uncertainty in a 3D model? If a design engineer identifies it on screen,\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.lenam.cz\/en\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\/\" \/>\n<meta property=\"og:site_name\" content=\"LENAM s.r.o.\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-06T04:00:52+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-18T11:01:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.lenam.cz\/wp-content\/uploads\/2026\/09\/c6565t01.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Barbora\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Barbora\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":[\"Article\",\"BlogPosting\"],\"@id\":\"https:\\\/\\\/www.lenam.cz\\\/en\\\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.lenam.cz\\\/en\\\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\\\/\"},\"author\":{\"name\":\"Barbora\",\"@id\":\"https:\\\/\\\/www.lenam.cz\\\/#\\\/schema\\\/person\\\/d77be18309e0f3f4e15d80b4f2a33e72\"},\"headline\":\"The Cost of Finding an Error Too Late: The Economics of Engineering Simulation\",\"datePublished\":\"2026-10-06T04:00:52+00:00\",\"dateModified\":\"2026-11-18T11:01:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.lenam.cz\\\/en\\\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\\\/\"},\"wordCount\":1255,\"publisher\":{\"@id\":\"https:\\\/\\\/www.lenam.cz\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lenam.cz\\\/en\\\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.lenam.cz\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/c6565t01.jpg\",\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.lenam.cz\\\/en\\\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\\\/\",\"url\":\"https:\\\/\\\/www.lenam.cz\\\/en\\\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\\\/\",\"name\":\"The Cost of Finding an Error Too Late: The Economics of Engineering Simulation | LENAM\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.lenam.cz\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.lenam.cz\\\/en\\\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lenam.cz\\\/en\\\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.lenam.cz\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/c6565t01.jpg\",\"datePublished\":\"2026-10-06T04:00:52+00:00\",\"dateModified\":\"2026-11-18T11:01:42+00:00\",\"description\":\"How much can an error cost when today it appears to be nothing more than a minor uncertainty in a 3D model? If a design engineer identifies it on screen,\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.lenam.cz\\\/en\\\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.lenam.cz\\\/en\\\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.lenam.cz\\\/en\\\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.lenam.cz\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/c6565t01.jpg\",\"contentUrl\":\"https:\\\/\\\/www.lenam.cz\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/c6565t01.jpg\",\"width\":1280,\"height\":720},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.lenam.cz\\\/en\\\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Dom\u016f\",\"item\":\"https:\\\/\\\/www.lenam.cz\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Cost of Finding an Error Too Late: The Economics of Engineering Simulation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.lenam.cz\\\/#website\",\"url\":\"https:\\\/\\\/www.lenam.cz\\\/\",\"name\":\"Lenam s.r.o.\",\"description\":\"LENAM pat\u0159\u00ed ke \u0161pi\u010dce v oblasti simula\u010dn\u00edch metod a experiment\u00e1ln\u00ed mechaniky\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.lenam.cz\\\/#organization\"},\"alternateName\":\"LENAM\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.lenam.cz\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.lenam.cz\\\/#organization\",\"name\":\"LENAM, s.r.o.\",\"url\":\"https:\\\/\\\/www.lenam.cz\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.lenam.cz\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.lenam.cz\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/logo-lenam-blue.webp\",\"contentUrl\":\"https:\\\/\\\/www.lenam.cz\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/logo-lenam-blue.webp\",\"width\":324,\"height\":49,\"caption\":\"LENAM, s.r.o.\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lenam.cz\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.lenam.cz\\\/#\\\/schema\\\/person\\\/d77be18309e0f3f4e15d80b4f2a33e72\",\"name\":\"Barbora\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/76c03c3257faaded6d595fb6b976542e10585714b9a84d725ed018131b83e0e1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/76c03c3257faaded6d595fb6b976542e10585714b9a84d725ed018131b83e0e1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/76c03c3257faaded6d595fb6b976542e10585714b9a84d725ed018131b83e0e1?s=96&d=mm&r=g\",\"caption\":\"Barbora\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Cost of Finding an Error Too Late: The Economics of Engineering Simulation | LENAM","description":"How much can an error cost when today it appears to be nothing more than a minor uncertainty in a 3D model? If a design engineer identifies it on screen,","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.lenam.cz\/en\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\/","og_locale":"en_US","og_type":"article","og_title":"The Cost of Finding an Error Too Late: The Economics of Engineering Simulation | LENAM","og_description":"How much can an error cost when today it appears to be nothing more than a minor uncertainty in a 3D model? If a design engineer identifies it on screen,","og_url":"https:\/\/www.lenam.cz\/en\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\/","og_site_name":"LENAM s.r.o.","article_published_time":"2026-10-06T04:00:52+00:00","article_modified_time":"2026-11-18T11:01:42+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/www.lenam.cz\/wp-content\/uploads\/2026\/09\/c6565t01.jpg","type":"image\/jpeg"}],"author":"Barbora","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Barbora","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":["Article","BlogPosting"],"@id":"https:\/\/www.lenam.cz\/en\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\/#article","isPartOf":{"@id":"https:\/\/www.lenam.cz\/en\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\/"},"author":{"name":"Barbora","@id":"https:\/\/www.lenam.cz\/#\/schema\/person\/d77be18309e0f3f4e15d80b4f2a33e72"},"headline":"The Cost of Finding an Error Too Late: The Economics of Engineering Simulation","datePublished":"2026-10-06T04:00:52+00:00","dateModified":"2026-11-18T11:01:42+00:00","mainEntityOfPage":{"@id":"https:\/\/www.lenam.cz\/en\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\/"},"wordCount":1255,"publisher":{"@id":"https:\/\/www.lenam.cz\/#organization"},"image":{"@id":"https:\/\/www.lenam.cz\/en\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\/#primaryimage"},"thumbnailUrl":"https:\/\/www.lenam.cz\/wp-content\/uploads\/2026\/09\/c6565t01.jpg","inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.lenam.cz\/en\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\/","url":"https:\/\/www.lenam.cz\/en\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\/","name":"The Cost of Finding an Error Too Late: The Economics of Engineering Simulation | LENAM","isPartOf":{"@id":"https:\/\/www.lenam.cz\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.lenam.cz\/en\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\/#primaryimage"},"image":{"@id":"https:\/\/www.lenam.cz\/en\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\/#primaryimage"},"thumbnailUrl":"https:\/\/www.lenam.cz\/wp-content\/uploads\/2026\/09\/c6565t01.jpg","datePublished":"2026-10-06T04:00:52+00:00","dateModified":"2026-11-18T11:01:42+00:00","description":"How much can an error cost when today it appears to be nothing more than a minor uncertainty in a 3D model? If a design engineer identifies it on screen,","breadcrumb":{"@id":"https:\/\/www.lenam.cz\/en\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.lenam.cz\/en\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.lenam.cz\/en\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\/#primaryimage","url":"https:\/\/www.lenam.cz\/wp-content\/uploads\/2026\/09\/c6565t01.jpg","contentUrl":"https:\/\/www.lenam.cz\/wp-content\/uploads\/2026\/09\/c6565t01.jpg","width":1280,"height":720},{"@type":"BreadcrumbList","@id":"https:\/\/www.lenam.cz\/en\/the-cost-of-finding-an-error-too-late-the-economics-of-engineering-simulation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Dom\u016f","item":"https:\/\/www.lenam.cz\/en\/"},{"@type":"ListItem","position":2,"name":"The Cost of Finding an Error Too Late: The Economics of Engineering Simulation"}]},{"@type":"WebSite","@id":"https:\/\/www.lenam.cz\/#website","url":"https:\/\/www.lenam.cz\/","name":"Lenam s.r.o.","description":"LENAM pat\u0159\u00ed ke \u0161pi\u010dce v oblasti simula\u010dn\u00edch metod a experiment\u00e1ln\u00ed mechaniky","publisher":{"@id":"https:\/\/www.lenam.cz\/#organization"},"alternateName":"LENAM","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.lenam.cz\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.lenam.cz\/#organization","name":"LENAM, s.r.o.","url":"https:\/\/www.lenam.cz\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.lenam.cz\/#\/schema\/logo\/image\/","url":"https:\/\/www.lenam.cz\/wp-content\/uploads\/2025\/11\/logo-lenam-blue.webp","contentUrl":"https:\/\/www.lenam.cz\/wp-content\/uploads\/2025\/11\/logo-lenam-blue.webp","width":324,"height":49,"caption":"LENAM, s.r.o."},"image":{"@id":"https:\/\/www.lenam.cz\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.lenam.cz\/#\/schema\/person\/d77be18309e0f3f4e15d80b4f2a33e72","name":"Barbora","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/76c03c3257faaded6d595fb6b976542e10585714b9a84d725ed018131b83e0e1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/76c03c3257faaded6d595fb6b976542e10585714b9a84d725ed018131b83e0e1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/76c03c3257faaded6d595fb6b976542e10585714b9a84d725ed018131b83e0e1?s=96&d=mm&r=g","caption":"Barbora"}}]}},"_links":{"self":[{"href":"https:\/\/www.lenam.cz\/en\/wp-json\/wp\/v2\/posts\/4644","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lenam.cz\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lenam.cz\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lenam.cz\/en\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lenam.cz\/en\/wp-json\/wp\/v2\/comments?post=4644"}],"version-history":[{"count":8,"href":"https:\/\/www.lenam.cz\/en\/wp-json\/wp\/v2\/posts\/4644\/revisions"}],"predecessor-version":[{"id":4757,"href":"https:\/\/www.lenam.cz\/en\/wp-json\/wp\/v2\/posts\/4644\/revisions\/4757"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lenam.cz\/en\/wp-json\/wp\/v2\/media\/4653"}],"wp:attachment":[{"href":"https:\/\/www.lenam.cz\/en\/wp-json\/wp\/v2\/media?parent=4644"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lenam.cz\/en\/wp-json\/wp\/v2\/categories?post=4644"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lenam.cz\/en\/wp-json\/wp\/v2\/tags?post=4644"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}